New Goodway CNC lathes increase CNC turning capacity

Incremento della capacità di tornitura CNC

In spring 2025, VR Plast added two Goodway CNC lathes to its production department: the Goodway GS-2800LY and the Goodway GLS-2000 LYS. The introduction of these 5-axis machines increases internal turning capacity and expands machining possibilities for custom components in plastic and metal.

Increased CNC turning capacity

These two lathes introduce multi-axis configurations with integrated turning and milling capabilities, allowing complex operations to be completed in a single cycle. This reduces part repositioning and improves geometric consistency across machining stages.

Having multiple machines with complementary characteristics also enables better workload distribution and more stable production management, especially for small batches and recurring jobs.

Machine features

Goodway GS-2800LY

Goodway GS-2800LY

The GS-2800LY is a multi-axis CNC lathe with integrated milling capabilities. It is suitable for machining components that require combined operations and complex geometries, reducing intermediate steps.

Goodway GLS-2000 LYS

Goodway GLS-2000 LYS

The GLS-2000 LYS features a dual spindle and multiple controlled axes. This configuration allows full machining of the part in a continuous cycle, improving both precision and repeatability.

The machine is also equipped with a Top Automazioni bar feeder, enabling high-volume production in reduced time. In addition, the sub-spindle completes the machining process, further reducing cycle times.

Impact on production

  • increased internal CNC turning capacity;
  • reduction of setup time and repositioning operations;
  • improved management of multi-operation machining;
  • greater stability in production cycles;
  • more flexibility for small batches and complex components.

This investment is part of VR Plast’s ongoing machine park development, aimed at improving production efficiency and expanding the range of machining operations carried out in-house.

 Articolo successivo
»
Tempi di produzione standard

Standard production time

On-time delivery of processed material is expected within 3-4 weeks after your order. We deliver worldwide.

Tempi di produzione standard

Ultra-fast service for emergencies

We can handle your emergencies according to the production time needed for the part you require.

Tempi di produzione standard

Quick Quotes

To receive your quote as quickly as possible use the online quote request. Get your quote.